CE, IECEx, UL 508A, PSI and ASME are five separate scopes, not five grades of the same approval. One covers the pressure-retaining vessel. One covers the industrial control panel. One covers explosion-protected equipment. One is a professional-engineer peer review of a specific system. One is market access for pressure equipment sold into the EU. No single mark certifies a complete extraction system.
What do CE, IECEx, UL 508A, PSI and ASME each certify on extraction equipment?
Each mark certifies a different part of the system: UL 508A the control panel, ASME the pressure vessel, CE pressure equipment for the EU market, IECEx explosion-protected equipment, and PSI a peer review of one specific system.
Knowing which mark lands on the vessel and which lands on the panel is what keeps a plan review on schedule. When a submittal stalls, it is usually because a document that covers one subsystem was offered as proof for another, and the reviewer sent the package back. The table below is the short version engineers can hand to a vendor.
What does each mark cover, and what document proves it?
| Mark | What it certifies | Issuing body or scheme | Document that proves it | What it does not cover |
|---|---|---|---|---|
| UL 508A | The industrial control panel, 1000 V or less, ordinary locations | Panel shop under a UL certification program | Panel nameplate marking with its SCCR, plus the listing file | The connected loads — motors, heaters, the extractor itself |
| ASME BPVC Section VIII Div 1 | The pressure-retaining vessel above 15 psig | ASME certification program, National Board commissioned inspector | ASME certification mark plus the Form U-1 Manufacturer's Data Report | The control system, the room, the ventilation |
| CE (PED 2014/68/EU) | Pressure equipment above 0.5 bar maximum allowable pressure, for the EU market | Manufacturer's declaration, notified body where required | EU declaration of conformity and the technical file | US code compliance — it is not a US inspector's approval |
| IECEx | Explosion-protected equipment built to the IEC 60079 family | IECEx certification body (ExCB) | Certificate of Conformity, verifiable in the public IECEx database | The room classification itself |
| PSI | A specific system, by engineering peer review and field verification | Pressure Safety Inspectors (licensed PE) | Technical Report naming that model | Third-party product listing of the equipment |
MACH Technologies systems are built to CE, IECEx, UL 508A, PSI and ASME compliance marks, and they are designed, fabricated, assembled and tested in our vertically integrated Michigan facility. If you are working through how those marks fit a GMP-oriented buildout, the broader treatment lives in our guide to compliance-grade botanical extraction equipment.
What does UL 508A certify on extraction equipment?
UL 508A is the UL standard for industrial control panels. A UL 508A label means the panel was built and labeled to that standard by a panel shop under a UL certification program, not that the whole extraction system is listed.
A UL 508A mark on a skid tells you the panel was built and labeled to the standard. It tells you nothing about the extractor, the pumps or the vessels the panel controls.
What does the UL 508A scope include and exclude?
UL states that a UL certification for an enclosed industrial control panel only covers the control panel and not the connected loads or equipment that the panel controls. The standard itself draws the same boundary: UL 508A covers industrial control panels for general industrial use operating at 1000 volts or less, intended for ordinary locations per NFPA 70, and its scope excludes evaluation of the controlled equipment such as motors, heaters and other connected loads. That same record dates the 3rd Edition’s last revision to June 26, 2025, which is the edition to check your own documents against.
Because UL 508A addresses ordinary, non-classified locations, a panel serving a classified room follows a different evaluation path. Where the panel sits relative to the classified boundary is a design decision with consequences for wall penetrations and interlock routing, so settle it alongside which classification your process actually triggers rather than after the walls are drawn.
How do I verify a UL 508A claim on a quote?
Ask two questions: what is the panel’s marked short-circuit current rating (SCCR), and what listing file was it labeled under. NEC Article 409 requires industrial control panels to be marked with a Short-Circuit Current Rating and installed so that available fault current does not exceed the marked value, which is why the SCCR belongs on the submittal and not in a sales conversation. UL notes that short-circuit current ratings for individual industrial control panels are established under UL 508A Supplement SB, the only method specifically recognized by the NEC. That detail separates a panel built to the standard from a box assembled out of listed parts.
Panel construction, SCCR documentation and nameplate review are covered in depth in our piece on UL 508A control panels for extraction systems, and the available fault current side of the question is sized together with what a C1D1 room requires.
What does ASME certification cover on extraction equipment?
ASME code construction applies to the pressure-retaining vessels in a system. The document that proves it is a Manufacturer’s Data Report, not a logo on a brochure.
When does ASME BPVC Section VIII Division 1 apply?
ASME BPVC Section VIII Division 1 applies to pressure vessels operating at internal or external pressures above 15 psig, and it contains the rules for the ASME certification mark with the U designator.
ASME states that Section VIII Division 1 provides design, fabrication, inspection, testing and certification requirements for pressure vessels operating at internal or external pressures exceeding 15 psig, fired or unfired. Above that line the vessel is in scope, and the Division that applies follows from the design conditions. For placing your own equipment: Division 3 provides rules for pressure vessels operating above 10,000 psi, while Division 1 contains the rules for use of the single ASME certification mark with the U, UM and UV designators.
What document proves a vessel was built to ASME code?
The Form U-1 Manufacturer’s Data Report for the specific vessel, requested by serial number, is the proof of ASME construction; the ASME certification mark may only be used on an item constructed in accordance with all applicable rules of the Code.
Ask for the Form U-1 Manufacturer’s Data Report, by serial number. It records the vessel’s design, materials and hydrostatic test, and it is signed by an inspector holding a valid commission from the National Board of Boiler and Pressure Vessel Inspectors. A vendor who can produce the U-1 for the specific vessel has answered the question. A vendor who sends a logo has not. The Code sets the same obligation for every builder, ours included: ASME guidance states that markings including the ASME Single Certification Mark shall not be used on any item that is not constructed in accordance with all applicable rules of the Code.
ASME construction reaches the vessel and stops there. It says nothing about the control panel, the room classification or the ventilation serving the space. Pressure ratings and the full documentation set for a recovery circuit are handled in our write-up on ASME-rated vessels and pressure equipment and in the system-level view of pressure ratings and the documentation package.
What do CE marking and IECEx each cover on extraction equipment?
CE is a declaration that equipment meets the EU directives that apply to it. IECEx is an independently tested and audited certificate carrying a public reference number. They answer different questions.
What does CE marking cover on extraction equipment?
CE marking under the Pressure Equipment Directive 2014/68/EU covers pressure equipment with a maximum allowable pressure above 0.5 bar that is placed on the EU market. It is not a US inspector’s approval.
Directive 2014/68/EU applies to the design, manufacture and conformity assessment of pressure equipment and assemblies with a maximum allowable pressure PS greater than 0.5 bar. In-scope equipment must meet essential safety requirements covering design, manufacture and testing, satisfy conformity assessment procedures and carry the CE marking before being made available on the EU market. CE addresses placing equipment on that market. Keep the request simple: ask which directive the EU declaration of conformity names, and where a notified body was involved, which one.
What does IECEx cover, and how do I verify an IECEx certificate?
IECEx is the IEC’s international certification scheme for equipment used in explosive atmospheres, assessed against the IEC 60079 series. Every IECEx certificate can be checked by number in a public online database.
An IECEx Certificate of Conformity is issued on the basis of a type-test report (ExTR) on a sample selected from the factory and a factory Quality Assessment Report (QAR) from an approved IECEx certification body, through independent third-party testing and evaluation. That is the structural difference from a self-declaration.
Then comes the most actionable line in this article. IECEx certificates are published in a public, searchable online certificate database that a buyer can check by certificate number. For scale, iecex.com reports that all issued IECEx certificates, licences and reports are publicly accessible through the IECEx On-Line Certification System, and that IECEx was established by the IEC in 1996 and now comprises more than 60 approved certification bodies in more than 35 countries.
How do IECEx Zones relate to North American Class and Division?
Zones and Divisions are parallel frameworks that describe the same hazard, but they are not a one-to-one translation.
IECEx certification is based on the IEC 60079 series of international standards covering equipment for explosive atmospheres, the same family behind the zone system, while North American practice uses Class and Division. Both describe the same hazard, which is why a system can be specified against either depending on where it is installed. Do not treat them as a one-to-one translation; work the classification question on its own, with the room.
What does a PSI peer review cover, and how does it differ from UL 1389?
UL 508A, ASME and IECEx each evaluate a part of the system. Only two paths examine the assembled machine: a third-party listing to an equipment standard by a Nationally Recognized Testing Laboratory, or a licensed professional engineer’s peer review of that specific build.
What does a PSI engineering peer review produce?
A PSI peer review produces a Technical Report from a licensed professional engineer on a specific system, as designed and, where field verification is performed, as installed. It is not a third-party product listing of the equipment.
Pressure Safety Inspectors was founded in 2014 and provides field verification, engineering peer reviews issued as Technical Reports, and consulting services to the extraction industry. A peer review produces a report from a licensed professional engineer covering the system as designed and, where field verification is performed, as installed. Its value is that it addresses the assembled system in its jurisdiction, which a component-level listing does not. What form of review a reviewer will accept varies by jurisdiction; confirm with the Authority Having Jurisdiction before equipment is ordered.
What is UL 1389, and is MACH equipment listed to it?
UL 1389 is the bi-national US and Canadian equipment-level standard for plant oil extraction equipment. It is not among MACH Technologies’ compliance marks, and we do not represent our equipment as listed to it.
ANSI/CAN/UL/ULC 1389 is a bi-national US and Canadian standard for commercial and industrial plant oil extraction equipment in ordinary (unclassified) and hazardous (classified) locations, addressing fire, electric shock, injury and explosion risks, and covering preparatory equipment, extractors, extraction booths and pods and post-processing equipment; field evaluation is available for installed equipment that is not certified or has been modified. On solvents, UL 1389 covers extractors using butane, ethanol, n-hexane, liquefied petroleum gas, pentane or propane as flammable solvents and carbon dioxide as a non-flammable solvent, plus post-processing equipment such as vacuum ovens, rotary evaporators and solvent recovery pumps. UL adds that plant oil extraction equipment is evaluated to UL 1389 for installation in unclassified areas, or in or involving Class I Division 1 or Division 2 hazardous locations, depending on the product technology and intended use.
UL 1389 is not among our compliance marks, and we do not represent our equipment as listed to it. It is the equipment-level standard that exists in this market, and it is worth asking any vendor where their equipment sits relative to it.
A quote can be claiming three different things: a product listed to an equipment standard, a system covered by an engineering peer review, or a machine built from individually listed components. Each is a real answer. They are not substitutes, and the reviewer will treat them differently.
What documents should I request from an extraction equipment vendor before plan review?
Request one proof document per mark, during specification and before room boundaries are locked. Send the vendor a document request, one line per mark:
- The panel nameplate marking with its SCCR, and the listing file it was labeled under.
- The Form U-1 Manufacturer’s Data Report for each pressure vessel, by serial number.
- The IECEx Certificate of Conformity number, which you then verify yourself in the public certificate system.
- The EU declaration of conformity, naming the directive it was issued against.
- The professional-engineer Technical Report naming the specific model.
Who is responsible for what in the submittal?
The ownership split is where projects slip. The manufacturer supplies equipment specifications, listings and process data. The operator commissions the classification study and owns the submittal package. The Authority Having Jurisdiction approves the installation. No mark moves responsibility between those three.
When should compliance documents be requested?
Sequencing matters as much as content. These documents are inputs to construction drawings, not paperwork that arrives with the crate. Request them during specification, before sizing utilities for an extraction lab and before room boundaries are locked. Equipment destined for Canada also involves a separate provincial registration path for pressure-containing components, including a Canadian Registration Number; confirm the route with your vendor and the province early.
On our side, installation, operator training and technical support are part of the system, and the documentation package is assembled alongside the equipment rather than chased afterward. If a submittal deadline is driving your schedule, talk to our engineering team about a documentation package while the layout is still on paper. The same approach applies across our ethanol extraction systems and hydrocarbon extraction equipment lines.
Extraction equipment must be installed, permitted, and operated in accordance with all applicable federal, state, and local fire, building, and electrical codes, including Class I Division 1 requirements where applicable. Consult your Authority Having Jurisdiction (AHJ) before installation.
Operators are responsible for verifying that their intended use is lawful in their jurisdiction.
Frequently asked questions about extraction equipment compliance marks
Does any single mark certify a complete extraction system?
No. CE, IECEx, UL 508A, PSI and ASME are five separate scopes, not five grades of the same approval. Each covers a different part of the system or a different question, so a complete submittal draws on several of them.
Does a UL 508A mark mean my whole extraction system is certified?
No. It covers the industrial control panel, and the standard’s scope excludes the controlled loads and equipment. Ask separately what covers the pressure vessels and what covers the assembled system.
When does a vessel need to be built to ASME Section VIII?
Section VIII Division 1 applies to pressure vessels operating above 15 psig, with the applicable Division determined by the design conditions. Whether certification is required also depends on the installation jurisdiction and the project specification, so confirm with your AHJ and your insurer.
Is a CE mark accepted by a US inspector?
CE marking addresses placing equipment on the EU market under the directives that apply to it. A US inspector evaluates the installation against US codes and the equipment’s US listings or engineering review, so treat the two as answering different questions.
How do I check that an IECEx certificate is real?
Look up the certificate number in the public IECEx certificate system, which anyone can search without contacting the manufacturer. A certificate that cannot be found by number is a question for the manufacturer before it is a question for the inspector.
Is an engineering peer review the same as a product listing?
No. A listing evaluates a product against a published standard through a testing laboratory, while a peer review is a licensed professional engineer’s assessment of a specific system, often paired with field verification of the installed machine. Which one a reviewer wants varies by jurisdiction, so ask the AHJ.