Glandular resin heads measure roughly 40 to 110 micrometres across. A 2023 peer-reviewed study of glandular trichome development and morphology (Punja et al., Springer Nature open access) measured capitate-stalked glandular heads at 40 to 110 µm in diameter, with stalk lengths from 20 to 1,100 µm. That single range is why commercial screen stacks are graduated into fractions across that band and the sizes immediately above and below it, and why this market names output by micron band rather than by visual appearance.
For a buyer, the consequence is direct: the band you intend to sell is what selects your separation line. What follows covers types of hash and the ice-water/dry-sift systems that make them from the purchase-order side. It compares the two process routes that produce every mechanically separated grade on the market, puts hard numbers against both, and tells you what to normalize before you compare quotes. The two deep specification guides sit one click away if you already know your route — how to specify a commercial ice-water hash washing system and specifying dry screening equipment for commercial throughput.
The number that defines every hash grade on the market: 40 to 110 microns
Why glandular head diameter sets the screen stack
A separation line is a sorting machine. It does not create a grade; it isolates a particle population that was already on the plant material. Because the heads cluster in a 40 to 110 µm band and the stalks, leaf fragments and cellular debris around them fall above and below it, a graduated screen stack can split the slurry or the dry fines into fractions by size alone.
Stack design follows from that. The coarse screens at the top of the stack reject stalk and vegetative material, the middle screens collect the fraction dominated by intact heads, and the fine screens catch ruptured heads and fines. The trade generally sells the mid-range fractions as its premium grade. That mapping is market convention, and no standard defines a micron number as a grade. For screen micron bands, certified mesh grades, and throughput per shift, see our trichome extractor specification guide.
What a micron rating on a screen is actually standardized against
A micron rating on a production screen refers to the nominal aperture of the woven wire cloth, and it is standardized with a defined tolerance. ASTM E11 specifies the technical requirements for woven wire test sieve cloth and test sieves, applies to sieves with nominal aperture sizes from 125 millimetres down to 20 micrometres, and defines nominal opening sizes, wire diameters and permissible tolerances for each sieve designation. ASTM maintains the document through dated revisions — the current one is E11-24 — so the number a supplier quotes points to a published specification you can look up and inspect against.
That matters commercially. A micron figure is a tolerance-bounded specification you can write into a purchase order, rather than a figure a vendor selected for a brochure. Be aware that the ISO 3310 series and the older US Standard Mesh designations get used interchangeably in quotes, which is one reason two suppliers describe "the same" screen differently. A cloth with a 75-micrometre nominal opening, for example, carries the No. 200 designation in the US Standard Mesh series and is called out by its 75 µm aperture under ISO 3310. Same cloth, two vocabularies. Ask which designation a number refers to and require the answer in writing.
From particle size to purchase decision
An extraction director choosing between parallel lines, a contract processor justifying six-figure capital against a contracted SKU mix, and a facility engineer who needs utility numbers and stub locations before the slab is poured all arrive at the same requirement: numbers that survive a comparison. The rest of this page supplies them. If you want the output-side taxonomy instead, the full range of hash types and what each production route yields covers it in depth.
Two process routes, not ten product types
The real difference between ice-water separation and dry mechanical separation as a capital purchase is the separation medium: chilled water in one case, air plus mechanical agitation in the other. Everything the search results list as a separate "type" is a variation of feedstock condition, screen fraction, or post-separation handling layered on top of one of those two routes. Collapse the taxonomy and you are left with two purchase orders.
What each route does to the resin head
In the ice-water route, chilled water makes the heads brittle, controlled agitation releases them from the plant material, and a graduated screen stack grades them by size as the slurry moves through. The material comes off the stack wet.
In the dry mechanical route, material is tumbled or screened in air with no water in the process at all. Separation depends on feedstock condition, agitation energy and screen selection rather than on temperature-driven embrittlement in a water column. The material comes off dry. A broader treatment of both sits in the different solventless extraction methods.
What each route obligates you to downstream
This is where the purchase decision is actually made. A wash line obligates you to a drying step, a conditioned water supply, a discharge path, and a chilled-fluid load that is separate from the vessel itself. A dry line obligates you to none of those, and instead puts airborne fines and dust containment at the center of the room design.
Those two obligation sets barely overlap. They are two different rooms with two different mechanical systems, and a facility that runs both plans them as two rooms from the start.
Why this is a process-selection decision and not a quality ranking
We build machines; we do not process material, so we have no position on which route makes better product. What this comparison ranks is what you have to build, staff and power. The honest framing is that one route is drying-dependent and water-dependent, the other is containment-dependent and feedstock-sensitive, and the right answer is the one your contracted output mix and your existing utilities support.
Specification table: comparing the two routes on numbers a buyer can verify
Below are published specifications for one representative system on each route. Both are designed, fabricated, assembled and tested in our vertically integrated Michigan facility. These are published equipment ratings, not outcomes any buyer is promised.
| Specification | Ice-water separation line | Dry mechanical separation line |
|---|---|---|
| Separation medium | Chilled water plus controlled agitation | Air plus mechanical agitation across screens |
| Rated batch basis | Fresh-frozen mass, dry mass, or vessel volume | Mass per unit time |
| Published rating | TSS-300: 300-litre (79-gallon) stainless wash vessel; 7.5 kg dry material or 25 kg fresh-frozen biomass per batch; up to 10 wash cycles per process | ATS Pro: up to 1 kg every 30 minutes; published specification states up to 99% heads in two screen passes |
| Electrical service | 208–230V / 3PH / 60Hz at 10 FLA, excluding chiller load | 230V; the published specification does not break out phase, frequency or FLA — confirm against the current specification sheet |
| Water supply | Conditioned water; optional reverse osmosis filtration and integrated water chilling | None |
| Discharge requirement | Discharge path required per wash cycle | None |
| Drying dependency | High — wet material requires drying before further handling | Low — published specification states it significantly reduces the need for freeze drying |
| Containment concern | Water handling, wet floor surfaces, cold-chain staging | Airborne fines and dust containment |
| Process control | Recipe-driven control, automated wash-tank top-off, integrated removable stainless mesh basket | Temperature control and vacuum flow |
| Wetted materials | Stainless wash vessel with integrated removable stainless mesh basket; call out 304 vs. 316/316L on every product-path surface in the order | Not broken out in the published specification; require 304 vs. 316/316L stated per surface on the order drawing |
| Representative MACH system | TSS-300 trichome separation system | ATS Pro automated trichome separation |
Rated batch capacity and the two rating bases
Vendor capacity quotes are not comparable because suppliers quote against different bases. One quotes fresh-frozen mass, another quotes dry mass, a third quotes vessel volume, and all three publish a single headline number. The MACH TSS-300 specification shows how wide that spread looks on paper: the same 300-litre vessel is rated at 7.5 kg of dry material or 25 kg of fresh-frozen biomass per batch. The threefold gap is moisture accounting. Fresh-frozen biomass is largely water by mass, so those two figures describe roughly comparable quantities of actual plant material entering the same vessel.
Normalize before you compare. Require every supplier to state rated batch capacity on all three bases for the same unit, in writing, plus a practical minimum batch. A unit that runs well at full charge and poorly at a quarter charge is a different asset than its datasheet suggests if your modal batch is small.
Utility draw, and what the nameplate excludes
The TSS-300's 10 FLA figure at 208–230V/3PH/60Hz is the vessel's load and explicitly excludes chiller electrical load. The chiller is a separate and frequently larger draw, and it is the single most common reason a room comes in undersized on service.
Size the room off a load schedule that lists every component rather than off the headline nameplate of the largest machine. Sizing utilities for an extraction lab walks through the full input list. Your electrical engineer owns the final calculation.
Drying dependency and the real throughput ceiling
If a solventless line is not hitting its rated cadence, the vessel is usually not the constraint. Wet material off a wash line has to be dried before further handling, and freeze drying capacity caps the line far more often than separation capacity does. Add a second wash vessel in front of one dryer and you have built a queue rather than bought throughput.
This is the strongest workflow argument for evaluating the dry route seriously. The published ATS Pro specification states that it significantly reduces the need for freeze drying, and the process logic behind that is straightforward: a dry route produces dry material, so lyophilization carries far less weight on the critical path. For the broader method, measuring and scaling extraction system throughput shows how to find the real bottleneck before you buy capacity you cannot feed.
Matching the separation line to the output mix you intend to sell
Start from the SKU family you have contracted to supply and work backward to the line that produces it at the required cadence. The search results invert this, listing product types and describing them, which leaves a buyer with vocabulary and no purchase order.
Starting from the SKU family, not from the machine
Work this list before you take a single call:
- Modal batch size pulled from actual procurement records rather than from your largest harvest.
- Feedstock condition — what share of input arrives fresh-frozen versus dried.
- Batches per shift at the cadence your supply agreement requires.
- Existing freeze drying capacity, stated in kg per cycle and cycles per week.
- Available three-phase service at the panel, with headroom.
- Discharge path and conditioned water supply — present, or a construction line item.
Entry-tier single-phase units and three-phase production lines are different categories of asset. If lowest purchase price is driving the shortlist, price the drying capacity, the service upgrade and the labor hours alongside it before the comparison means anything.
Feedstock condition as the input the equipment does not control
A wash vessel rated on two bases is one capacity expressed two ways. Dried input and fresh-frozen input bring roughly comparable plant material into the same vessel once the water is accounted for, so neither condition carries a capacity penalty at the vessel itself. Where feedstock condition changes the calculus is in front of the line and behind it: fresh-frozen material carries a cold-chain obligation before it ever reaches the wash tank, and it leaves the wash line wet and queued for drying.
Cold chain in front of the vessel is a process input no machine controls. Material frozen promptly and held at temperature behaves differently in the vessel than material that thawed in transit, and no control recipe compensates for that. Fix the cold chain before you blame the equipment.
When a facility justifies running both routes in parallel
Parallel lines make sense when feedstock condition varies seasonally or when the SKU mix spans both outputs. Plan them as two rooms. Their utility and containment inputs barely overlap, and sharing a space usually means compromising both.
What a solventless line does and does not change about your room classification
A water-based separation process introduces no flammable solvent by way of the wash step itself, so as far as that step is concerned you are dealing with an ordinary, non-classified location. That is the direct answer, and it is where the easy part ends.
Classification follows the process and the room, not the machine
What the space actually requires depends on everything else present in it and on what your authority having jurisdiction determines. Sharing a room, a wall, or a mechanical system with hydrocarbon or ethanol operations changes the analysis entirely. Classification is a property of the process and the room, not of the machine — no equipment purchase changes the division an operation triggers, and no listing mark transfers a division rating onto a space.
Never characterize a solventless room as exempt from permitting. It is still a production space with electrical, fire and building requirements, and those are determined locally. If you are mapping classified and unclassified areas across a buildout, which classification your process actually triggers covers the decision in more detail.
The control panel questions that actually come up at inspection
A UL 508A listing applies to the industrial control panel, not to the separation system the panel controls. Two questions do most of the work at inspection: what is the panel's listing file, and what is its marked short-circuit current rating. The marked SCCR must equal or exceed the available fault current at the point of installation, and your electrical engineer makes that comparison from the site data.
MACH builds to CE, IECEx, UL 508A, PSI and ASME marks. We do not claim marks outside that set, and neither should any supplier you are evaluating.
Where the AHJ conversation starts
Start it early, with drawings in hand, before the construction set is locked. Bring the general arrangement, the utility stubs, the load schedule and the panel listing documentation. Your AHJ and your design professional determine what the space requires. Equipment specifications feed that conversation and never stand in for it.
The RFQ checklist: what to ask before you commit to a separation route
Questions that normalize competing quotes
- Rated batch capacity on all applicable bases — fresh-frozen mass, dry mass, vessel volume — for the same unit.
- Practical minimum batch at which the published rating still holds.
- Quoted cycle time broken into load, separation, collect and reset.
- Agitation or screening control granularity, including recipe storage and recall.
- Electrical service stated both including and excluding chiller load.
- Water quality requirement and discharge volume per cycle, where applicable, and whether reverse osmosis filtration conditions the incoming supply.
- Screen stack fractions supplied, sieve designation standard referenced, and replacement-consumable terms.
- Wetted-material specification — 304 versus 316/316L stainless on every surface in the product path.
- Control panel listing file and marked SCCR.
Documentation that makes a six-figure asset defensible
Require the general arrangement and utility-stub drawings, the operation and maintenance manual, the spare-parts list, material documentation and the lead time before you sign. A public specification sheet is a starting point; the equipment schedule entering a construction set should come from the current order-specific drawing, because configuration options change footprint, loads and stub locations. Rework at that stage costs weeks of schedule.
For a multi-state operator, the documentation package is an asset record. Drawings, listings, material documentation and maintenance history are what make a machine defensible in an audit, transferable across a footprint, and serviceable in five years.
What ships with the system
MACH designs, fabricates, assembles and tests these systems in its vertically integrated Michigan facility, and installation, operator training and technical support ship with the system rather than being priced as an afterthought.
Bring us your batch profile and we will size the line against it: modal batch size, feedstock condition, batches per shift, and your existing drying capacity. Configure a separation line against your batch profile and we will tell you what the room has to support before you pour anything.
Frequently asked questions
What micron range do resin gland heads actually fall into?
Roughly 40 to 110 micrometres in diameter for capitate glandular heads, with stalk lengths from 20 to 1,100 micrometres, per a 2023 peer-reviewed morphology study. That distribution is what makes size-based separation work and why commercial screen stacks are graduated into fractions across that band and the sizes around it.
What does a micron rating on a production screen refer to, and is it standardized?
It refers to the nominal aperture of the woven wire cloth, and ASTM E11 standardizes it. The standard covers sieves from 125 mm down to 20 micrometres and defines nominal opening size, wire diameter and permissible tolerance for each designation, which means the number is inspectable and can be written into a purchase order.
How much material can a commercial ice-water separation system process per batch?
The MACH TSS-300 specification rates its 300-litre (79-gallon) stainless wash vessel at 7.5 kg of dry material or 25 kg of fresh-frozen biomass per batch, with recipe-driven control supporting up to 10 wash cycles per process. Capacity figures vary with configuration and process parameters.
Can one system run both fresh-frozen and dried input?
Yes. The TSS-300 is rated for both. The two numbers — 7.5 kg dried or 25 kg fresh-frozen — are the same capacity stated on two moisture bases, since fresh-frozen biomass is largely water by mass, so neither input condition penalizes the vessel. Confirm which basis a competing quote used before you compare it to anything.
What caps throughput on a solventless line if it is not the vessel?
Drying capacity, most often. Wet material off a wash line must be dried before further handling, and freeze drying cycle time frequently sets the real ceiling, which is why adding a second wash vessel in front of a single dryer builds a queue instead of capacity.
Does a solventless separation room trigger a hazardous-location classification?
The water-based separation step itself introduces no flammable solvent, so that step alone points to an ordinary, non-classified location. What the room requires depends on everything else present in it and on your authority having jurisdiction, and no equipment purchase or listing mark changes that determination.
Extraction equipment must be installed, permitted, and operated in accordance with all applicable federal, state, and local fire, building, and electrical codes, including Class I Division 1 requirements where applicable. Consult your Authority Having Jurisdiction (AHJ) before installation. Throughput, yield, purity, and solvent recovery figures vary with input material, system configuration, and process parameters. Published figures are not a guarantee of results. MACH Technologies manufactures and sells processing equipment; it does not cultivate, produce, sell, or distribute any botanical end product. Nothing on this site is medical advice, and no MACH Technologies equipment or the products made with it are represented as diagnosing, treating, curing, or preventing any disease. Operators are responsible for verifying that their intended use is lawful in their jurisdiction.